Fri Mar 12, 2010 2:18 am
Today, the septic people spent from 9 am until 6 pm but the septic system is all in for all three homes. It's an aerobic system and has two big tanks and three smaller tanks and miles of pipes going every which way. I hope when the electric company comes tomorrow to hook the service poles to the transformer they don't drive over anything important. It's all marked pretty well. dr and I walked down to check it out after they left. They made a trench for the water lines too so now Rufus doesn't have to dig that by hand.
I think once the electric company comes tomorrow that is all the outside contractor work. Then comes laying and hooking up water lines, building decks and skirting each home.
I planted the rose bush that Glenda brought over on Tuesday into a pot because I don't know when I will get it planted or the other 10 that I bought (?)
I mixed up plant food and watered them all. I trimmed back my herbs where little portions froze during the winter. I trimmed the gardenia bushes back some. They were green most of the winter but the last freeze got them. It went down to 10 degs. They are still green inside and some small green shoots were coming up from the bottom so I cut off the dead shoots. I took some pictures of the wildflowers that are in the yard so will try to get them done tomorrow. Things are coming along now but it's not moving time yet.
dooley